Hardwood Floor Articles

Hardwood Flooring Care Tips
Hardwood Flooring - Latest Trends
Choosing Distressed Hardwood Flooring
Compare Hardwood Floor prices
Common facts - Hardwood Floors
  more

Cork Flooring Articles

Update your kitchen with Cork
Caring for your Cork Floor
Relieve pains with Cork Flooring
Benefits of Cork Flooring
Cork Flooring basics
  more

Bamboo Floor Articles

Bamboo Flooring Pros & Cons
Bamboo Floors For The Eco Minded
Bamboo Flooring - Unique and Innovative
Bamboo - The New Hardwood Floor
Installing Your Bamboo Floor
  more









  My account   My cart   My sample cart
 
Hardwood Floors
Cork Flooring
Exotic Hardwood Flooring
Distressed - Handscraped Hardwood Floors
Bamboo Flooring
Unfinished Hardwood Flooring
Linoleum Planks
Laminate Floors
Designer Stone Tiles
Leather Floor Tiles

 
HomeHardwood FloorsExotic Hardwood FlooringSolid Exotic Hardwood FloorsBrazilian Teak  
   
 
Product Installation
 

 

Nail Down

Solid Strip & Plank Installation Methods

A. Always follow the manufacturers recommended installation procedure.

B. Unfinished and factory-finished solid plank should be installed perpendicular to the joists or on a diagonal for any single layer subfloor. (Exception: Over diagonal, solid subfloor boards, install perpendicular to joists or subfloor direction.)

C. When ¾" solid plank flooring is laid parallel with the floor joists, follow one of these two steps:

  1. Add a layer of minimum nominal ½" (15/32”) CD Exposure 1 (CDX) plywood underlayment to the existing subfloor (as previously recommended)

  2. Or brace between truss/joists in accordance with the truss/joist manufacturer’s recommendations and with local building codes. Some truss/joist systems cannot be cross-braced and still maintain stability.

D. Before installing wood flooring, place an approved vapor retarder. Some examples of acceptable vapor retarders over wood subfloors include:

  1. An asphalt laminated paper meeting UU-B-790a, Grade B, Type I, Style 1a.

  2. Asphalt-saturated kraft paper or #15 or #30 felt that meets ASTM Standard D-4869 or UU-B-790, Grade D.

E. Wall Line Layout

  1. Choose a starting wall according to the most aesthetically or  architecturally important elements in the room, taking into consideration fireplaces, doors, cabinets and transitions, as well as the squareness of the room. The starting wall will often be the longest unbroken wall in the room.

  2. Snap a working line parallel to the starting wall, allowing ¾” expansion space between the starting wall and the edge of the first strip or plank run.

  3. As a general rule, a ¾” expansion space must be left around the perimeter and at all vertical obstructions.

  4. Random-width plank is laid out with alternating courses varying by widths. Start with the widest board, then the next width, etc., and repeat the pattern.

  5. Lay one row of strip or plank along the entire length of the working line.

  6. Top-nail and blind-nail the first row (hand-nail if necessary), using appropriate fasteners. Denser species may require pre-drilling. Each succeeding row should be blind-nailed with the nailing machine wherever possible. At the finishing wall and other obstructions, it may be necessary to blind-nail by hand until top nailing is required.

  7. Racking rule of thumb: Stagger end-joints in adjacent rows at least three times the width of the boards, as product allows. Avoid H-joints. (See Figures 1 and 2.)

Figure 1 Stagger End Joints

 

Figure 2 Avoid “H” Joints

 

  8. To minimize expansion on floors wider than 20 feet, more or less spacing between rows may be needed, depending on geographical area, interior climate control and time of the year.

9. Where spacing is required: Use a washer or removable spacer to leave additional space

every few rows and/or start in center of room and work out to both sides. Do not use

spacers that may cause damage on factory-finished products.

10. Nailing: Blind-nail through the tongue using 1½"-2” fasteners. Use 1½" fasteners with

nominal ¾" plywood subfloor direct to concrete slab. Face-nail boards where needed

using 6d-8d casing or finish nails. Fasteners should be spaced every 6”-8” on blindnailing,

or every 10”-12” on face-nailing.

11. For additional fastening, any of the following options may be used in addition to the

nailing schedule. (See Appendix F, Fastener Schedule.)

12. Follow manufacturer’s instructions for installing plank flooring.

13. For wide-width plank flooring (5” or wider), to assist the nailing schedule of 6”-8” and

increase holding power, there are three options.

a. Screw and plug at end joints, alternating at staggered locations and intervals along

each board.

b. Apply an approved wood flooring adhesive.

c. Use kerfing or relief cuts every 8” to 12” parallel to the grain – using more relief cuts

for wider boards. Typically, the relief cut should be 3/8” on a ¾” board.

NOTE: These options, however, will not necessarily eliminate cupping.

14. Blind-nail and face-nail, as necessary, to complete the final rows.

F. Center Line Layout

NOTE: For instructions on using the trammel point method to square a room and find

the center point, see Appendix G, Trammel Point Method.

1. Find the center of your room, measuring off the two longest walls, and snap a line down

the center of that room.

Copyright 2007 National Wood Flooring Association 13 Revised March 2007

Chapter 9 Solid Strip & Plank Flooring Installation

2. Install a starter board on the line. Fasten the starter board to the floor using wood

screws.

3. Nail the first row of wood flooring against the starter board, being careful not to move the

starter board when nailing. The groove of the flooring should be against the starter

board.

4. Drill and hand-nail the first three rows through the tongue. DO NOT USE TOP NAILS.

5. Use a blind nailer to install the remaining rows of wood flooring. Use the nailing practices

described earlier in the chapter.

6. After installing in one direction, remove the starter board and start rows going in the

opposite direction.

7. Install a spline or a slip tongue in the groove of the board that was against the straightedge.

Put wood glue down the entire length of the groove before installing the spline.

8. Install the spline using a blind nailer. To keep the spline in alignment for the next flooring

board, use a scrap piece of wood flooring to run along the length of the spline as you

nail.

9. Install the remaining rows in the opposite direction. Use the nailing practices described

earlier in the chapter.

Back to Top

 
search
Keyword Product ID
     Advanced Search

China Earthquake Relief
Financing Offers
Free Shipping Details
Lowest Possible Price Guarantee
Shipping Details
Returns/Cancellations
Login
Email
Password
Create Account
 
testimonials
Hardwood Flooring Testimonials"We are extremely happy with the flooring! Very Nice! After researching other flooring companies on the internet, as well as Lowe's and Home Depot, we found that Black River Floors.com was the best."
-Timothy F.
 
 
Other Links
  • Tax Free Purchasing
    Pay no tax on your purchase in
    most states...
  • Fast Guaranteed Delivery
    Nationwide Delivery with arrival times typically 5-7 business days.
  • Full Warranties. All premium
    grade floors

    All products covered by Full Manufacturer Warranties.
 
 
 
     
Click to verify BBB accreditation and to see a BBB report. We gladly accept the following for payment.
Please inquire for other options.


Checks By Phone/ Fax
Member: National Wood Flooring Association
 

Home :: Specials :: Policies : About :: Contact :: Sitemap :: Hardwood Floors :: Cork Flooring :: Exotic Floors :: Handscraped Floors :: Bamboo Floors :: Laminate Floors

© Copyright 2007 Black River Flooring Corp. All Rights Reserved.
Search Engine Optimization by Sansoft Technologies